Product Description
High temperature insulation board energy saving high R value xps installation
Attention:
In floor insulation installation, the ground should be clean and dry, without too much dust and loose structure. After being pasted, it needs to be compacted to exhaust gas.
When install the whole piece, please lay it on the side for better heat insulation and waterproof.
No water will at least one day after it is posted.
Not to tear the constructed heat insulation board after installation.